2003/04 – 2005/06 SERVICE
PLAN
Ministry of Transportation |
 |
 |
Objectives, Strategies, Performance Measures and Targets
This section describes the objectives and strategies that have
been devised to support each ministry goal, along with performance
measures and targets that will allow British Columbians to evaluate
the ministry’s success.
Goal 1: B.C. is provided with a safe and reliable highway system.
Objectives |
Strategies |
The provincial highway system
is maintained to a high standard through the efficient and effective
administration of road and bridge maintenance contracts. |
• By October 2004, tender
and award all road and bridge maintenance contracts under the
process established in 2002/03.
• Implement the Contractor Assessment Program, a new and
improved procedure for auditing the delivery of contracted highway
maintenance activities. The program incorporates staff audits
and reports, and reflects input from stakeholders. |
B.C.’s main highways are preserved
in their current condition — that is, not allowed to deteriorate.
|
• Regularly assess the
condition of the main highways.
• Rehabilitate the main highways according to a long-term
strategy and using the most cost-effective methods. |
Improved road access for resource
industries and rural residents. |
• Increase annual investment
in northern and heartland road reconstruction by $75 million
in 2003/04 through 2005/06. |
Improved highway safety. |
• Monitor highway safety
and implement corrective measures in high-risk locations, in
consultation with regional transportation advisory committees. |
Goal 2: Key transportation infrastructure is improved to drive
economic growth and trade.
Objectives |
Strategies |
Effective use of regional and
local input in setting transportation priorities. |
• Work with the regional
transportation advisory committees, which represent B.C.’s local
governments, businesses and transportation industry groups.
• Continue to partner with local governments on transportation
improvements. |
A practical, long-term framework
for an integrated, multi-modal transportation system in B.C. |
• Deliver a high-level
integrated provincial transportation strategy by March 31, 2004. |
Best use of available provincial
investment dollars. |
• Develop public-private
partnerships, in consultation with Partnerships BC.
• Aggressively seek federal government funding for projects.
• Pursue alternatives such as design/build/develop to capture
land value in funding transportation improvements.
• Complete projects on budget and on time, using the best
project management practices. |
Improved service and mobility
in urban areas and major trade corridors. |
• Focus cost-shared investment
on areas of economic and trade opportunity.
• Maximize highway safety and reliability through low-cost
improvements (signage, lighting, lane markings, etc.)
• Balance landowner access to main highways with the mobility
needs of long-distance users. |
Goal 3: Improved competitiveness for B.C.’s transportation industries.
Objectives |
Strategies |
Effective alternate service
delivery by the private sector to encourage economic activity. |
• Complete the privatization
of selected operations (sign shop, electrical operations, pavement
marking, radio systems and inland ferries) by March 31, 2004.
• Complete the commercialization of rest areas to reduce
costs.
• Establish full cost recovery options for the rural subdivision
approvals process.
• Ensure the rural subdivision approvals program is made
available for transfer to all regional districts that express
interest, effective April 1, 2004. |
A one-third reduction in the
provincial regulatory burden on the public, industry and stakeholders
by June 30, 2004. |
• Work for the relevant
legislation and Orders-in-Council to be in place by June 2004. |
Simplified licensing and processing
procedures for commercial transportation carriers, with safety
as the primary criterion. |
• Reduce the number of
motor carrier licensing regulations by an initial 20 per cent
by March 31, 2004.
• Streamline procedures for assessing motor carrier license
applications.
• Work with the commercial trucking industry and neighbouring
jurisdictions to implement technological improvements that will
reduce time spent at weigh scales.
• Consider the administration of weight and size restrictions
as a means to maximizing the trucking industry’s ability to
move goods and create economic activity. |
Reduction or elimination of
third party regulations and policies that impede B.C.’s ability
to compete with other jurisdictions in the transportation market. |
• Work with the Vancouver
International Airport Authority (YVRAA) to encourage the federal
government to adopt a policy of liberalized international air
agreements that would allow more carriers to stop in Vancouver
and either pick up or drop off passengers and goods. This would
be negotiated on a reciprocal basis with other countries, especially
the U.S.
• Work with YVRAA and the Vancouver Port Authority to facilitate
seamless connecting transportation for cruise ship passengers,
and to identify strategies to compete effectively with Seattle
for cruise ship traffic. |
Goal 4: Achieve excellence in customer service, and be recognized
as a good employer.
Objectives |
Strategies |
Excellent service is provided
to all British Columbians. |
• Undertake annual surveys
of customer satisfaction, and compare survey results with baseline
data to ensure customer needs are met. Baseline data was developed
in 2002 through surveys of highway users and of 22 specified
client groups.
• Use survey results and public feedback to improve customer
service related processes and procedures. |
Employees are provided with
the support, training and working environment that motivates
them to excel at their jobs. |
• Implement the ministry’s
Human Resource Management/People Plan to enhance productivity
and employee satisfaction. |
Performance Measures and Targets
The ministry assesses its performance using results-based performance
targets and measures. This allows us to track our progress in achieving
goals and objectives.
Goal 1: B.C. is provided with a safe and reliable highway system.
Objective: The provincial highway system is maintained to a
high standard through the efficient and effective administration
of road and bridge maintenance contracts.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Contractor Assessment Program:
• Rating of the maintenance contractors’ performance with
a maximum score of 1 |
0.91 |
0.91 |
0.91 |
0.91 |
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Highway Maintenance:
• Maintenance cost per lane kilometre |
$4,180 |
$4,170 |
$4,140 |
$4,210 |
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Reliability:
• Total closures on main highways |
Under development |
Under development |
Under development |
Under development |
Objective: B.C.’s main highways are preserved in their current
condition — that is, not allowed to deteriorate.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Pavement Condition:
• % of kilometres where condition is good or excellent
|
76% |
76% |
76% |
76% |

Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Bridge Condition:
• % of bridges where condition is good or excellent |
80% |
80% |
80% |
80% |
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Highway Rehabilitation:
• Number of lane kilometres resurfaced |
2,500 |
2,500 |
2,500 |
2,500 |
Objective: Improved road access for resource industries and
rural residents.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Surface Condition:
• % of kilometres where condition is good or excellent
|
34% |
37% |
40% |
43% |
Number of lane kilometres treated |
N/A |
870 |
870 |
870 |
Objective: Improved highway safety.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Highway Safety:
• Number of kilometres of rumble strip installed |
223 |
230 |
230 |
230 |
• Number of kilometres
of new guardrail installed |
11
|
13
|
13
|
13
|
Goal 2: Key transportation infrastructure is improved to drive
economic growth and trade.
Objective: Effective use of regional and local input in setting
transportation priorities.
Performance Measure |
Baseline |
2003/04 Target |
2004/05 Target |
2005/06 Target |
Documented input from Regional
Transportation Advisory Committees |
Establish committees and terms
of reference |
Solicit input; review and incorporate
input |
Evaluate committee effectiveness
|
Evaluate committee effectiveness |
Objective: A practical long-term framework for an integrated,
multi-modal transportation system in B.C.
Performance Measure |
Baseline |
2003/04 Target |
2004/05 Target |
2005/06 Target |
Status of strategic framework
document |
Complete technical work and
consultations |
Publish document by March 31,
2004 |
Review and update document,
and use for input to program decisions |
Review and update document,
and use for input to program decisions |
Objective: Best use of available provincial investment dollars.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Partnerships investment leveraged:
• Private investment capital leveraged through public-private
partnerships, plus defrayed or reduced costs from efficient
land use |
$20M
|
$35M
|
$70M
|
$140M
|
Federal funding investment
leveraged:
• Capital investment from federal government programs |
N/A
|
$45.9M
|
$62.2M
|
$60.2M
|
Capital project performance:
• % of work completed on budget |
100%
|
100%
|
100%
|
100%
|
• % of work completed
on schedule |
100% |
100% |
100% |
100% |
Objective: Improved service and mobility in urban areas and
major trade corridors.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Level of traffic congestion:
• % of vehicle-kilometres travelled in congested conditions
|
12.9%
|
13.9%
|
14.4%
|
14.9%
|
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Commercial trucking travel
time between major economic gateways |
Under development |
Under development |
Under development |
Under development |
Goal 3: Improved competitiveness for B.C.’s transportation industries.
Objective: Effective alternate service delivery by the private
sector to encourage economic activity.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Effective privatization of
ministry functions |
Under development |
Under development |
Under development |
Under development |
Objective: A one-third reduction of the provincial regulatory
burden on the public, industry and stakeholders by June 30, 2004.
Performance Measure |
Baseline |
2003/04 Target |
2004/05 Target |
2005/06 Target |
% reduction in legislation,
regulations and policies |
1,444 regulatory requirements |
Reduce by an initial 10% |
Achieve two-year target of
33% reduction |
Review need for further targets |
Objective: Simplified licensing and processing procedures for
commercial transportation carriers, with safety as the primary criterion.
Performance Measure |
Baseline |
2003/04 Target |
2004/05 Target |
2005/06 Target |
% reduction in the number of
motor carrier regulatory requirements |
824 regulatory requirements |
Reduce by an initial 20% |
Achieve two-year target of
33% reduction |
Review need for further targets |
Objective: Reduction or elimination of third party regulations
and policies that impede B.C.’s ability to compete with other jurisdictions
in the transportation market.
Performance Measure |
Baseline |
2003/04 Target |
2004/05 Target |
2005/06 Target |
Progress toward implementation
of an amended Canada-U.S. air travel agreement |
N/A |
Develop a negotiating strategy
and obtain support |
Implement strategy and report
on results |
N/A |
Goal 4: Achieve excellence in customer service, and be recognized
as a good employer.
Objective: Excellent service is provided to all British Columbians.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
In surveys, highway users’
satisfaction with existing ministry services and delivery processes,
rated on a scale of 1 to 10 |
6.5 |
6.5 |
6.6 |
6.8 |
Objective: Employees are provided with the support, training
and working environment that motivates them to excel at their jobs.
Performance
Measure |
Baseline |
2003/04
Target |
2004/05
Target |
2005/06
Target |
Employee satisfaction survey:
• Survey of employee satisfaction with organizational improvements
|
N/A
|
Establish baseline
|
10% improvement from baseline
|
10% improvement from 2004/05
|
|
|