ANNUAL SERVICE PLAN REPORTS 2004/05
Ministry of Sustainable Resource Management
Report on Performance
Overview of Ministry Goals and Linkage to Government Strategic Goals
In 2004/05, the ministry pursued four goals to fulfill its mission and vision and to support the government's strategic goals
as illustrated in Figure 1. The ministry's external services were provided through Goals 1, 2 and 3 with support from Goal
4 (organizational excellence). The Report on Results section (see page 25) provides details on progress towards achieving
each goal. For more information about the ministry divisions responsible for each goal, click on the web links in each goal
description.
Goal 1: Sustainable economic development of land and resources
Supporting resource-based sustainable development and diversification through land and resource planning decisions, increased
First Nations economic participation, and improved frameworks for balancing resource management decisions while maintaining
environmental integrity.
The ministry contributes to economic development opportunities under this goal by working with other ministries, First Nations,
local government and other stakeholders to provide provincial, regional and sub-regional guidance in a variety of plans, sector
strategies, policies, processes and decision tools. This planning helps ensure that resource management decisions take into
account the needs of communities, the economy and the environment, now and in the future. These planning processes enable
the province to increase certainty in resource allocation, attract investment, increase the diversification of resource-based
regional economies and realize resource-based economic opportunities that will benefit all British Columbians.
http://srmwww.gov.bc.ca/rmd/
Goal 1 operating expenditures were $17.3 million, 16 per cent of the ministry total and 34 per cent lower than 2003/04 expenditures.
Actual expenditures were greater than planned on Objective 1 (strategic land-use plans and policies) and less than planned
on Objectives 2 and 3.
Goal 2: Effective delivery of integrated, science-based land, resource and geographic information
Integrated land and resource information supporting ministry and client activities related to economic development, land-use
planning, sustainability and e-government services.
The ministry serves the needs of clients in other provincial agencies as well as many public and private organizations concerning
resource and other geographically-based information. It does so by collecting, integrating, storing, delivering and, in some
cases, analyzing and interpreting such information as well as improving the technologies that make this possible. It thus
provides a coordinated, cost-effective and collaborative approach to addressing client needs. As a consequence, a wide range
of public and private decisions are improved, access to British Columbia's resources is enhanced, the identification of investment
opportunities is accelerated and improved and costs are lowered to the private sector and government.
http://srmwww.gov.bc.ca
* (Click on Land Information BC.)
Goal 2 operating expenditures were $50.2 million, 47 per cent of the ministry total and 14 per cent lower than in 2003/04.
Actual expenditures on land titles under Objective 2 were less than budgeted because of the creation and operation of the
Land Title and Survey Authority from January 2005.
Goal 3: Sound governance of land and resource management
Principles, policies, legislation and processes to guide sustainable resource management.
The ministry develops principles, policies, legislation and processes for its clients that are clear and stable; strategically
focused on results; soundly based on information, analysis and consultation; and balanced from a sustainability perspective.
Through these approaches the ministry provides support to decision-makers in government and business concerning resource planning
and management, tenuring, disposal and pricing as well as property assessment. These same approaches are also applied in the
management of contaminated sites on Crown land and the administration of property assessment review panels. By these means,
the ministry helps to improve certainty in resource management.
http://srmwww.gov.bc.ca/clrg/
Goal 3 operating expenditures were $37.2 million, 35 per cent of the ministry total and 1,220 per cent higher than in 2003/04.
Supplementary funding of $34.5 million accounted for all of this increase (principally for contaminated sites remediation
and the BC Trust for Public Lands).
Goal 4: Organizational excellence
Demonstrated visionary leadership and continuous improvement through performance-focused staff as well as accountability and
transparency to the public.
Goal 4 establishes a foundation for achieving the ministry's overall mandate. The goal will be achieved by attaining excellence
in the ministry's services, its people and work environment. The ministry re-enforces organizational excellence by ensuring
the needs of staff and clients are met in a professional, timely manner.
Goal 4 operating expenditures were $1.9 million, two per cent of the ministry total. This was a two per cent decrease from
2003/04 resulting largely from reductions in training expenditures in line with the ministry's smaller staff size.
MSRM: From Government Vision to Future Reality for B.C.

Synopsis of Ministry Results
The ministry's goals, objectives, performance measures and results are summarized below.

- There were 17 performance measures in the 2004/05 – 2006/07 service plan.
- The targets on 14 performance measures were achieved, and on three of these the targets were exceeded by more than 20 per
cent. This amounts to an achievement rate of 82 per cent.
- The targets on two performance measures were mostly achieved (making at least 80 per cent of their target). If these are included,
the overall achievement rate is raised to 94 per cent.
- The target on one performance measure missed due to a conscious redirection of resources.
- These results represent an increase over last year's 90 per cent overall rate for achieved and mostly achieved targets.
Report on Results
This section reports the progress made by the ministry on its objectives under each ministry goal through its performance
measures and accomplishments. The principal strategies supporting each objective are also listed along with comments where
applicable concerning their progress. All are considered ongoing unless otherwise noted.
Goal 1: Sustainable economic development of land and resources
Core Business Area: Sustainable Economic Development
Objective 1: Complete priority strategic-level land and resource management planning and cost-effective implementation strategies
Excellent progress has been made on most strategies and all performance targets have been achieved.
Consensus has been reached at LRMP planning tables for the Central Coast, North Coast, Morice, Sea-to-Sky and Haida Gwaii/Queen
Charlotte Island areas of the province and these plans have been moved to government-to-government consultations with First
Nations. The Working Forest policy will be implemented using existing tools including retention of the Provincial Forest designation.
Strategies
- Designate the Working Forest land base.
- Complete priority strategic-level land and resource-use plans to facilitate sustainable development.
- Substantially complete designation of Protected Areas for the province.
- Develop implementation strategies for completed strategic-level plans that address such issues as plan monitoring, more
detailed planning requirements, eco-system based management, economic opportunities and First Nations values and concerns.
- Develop and refine socio-economic and environmental assessment tools to inform land and resource decisions.
Note:
The strategies concerning the Working Forest and the designation of Protected Areas for the province were modified6:
-
The government announced in June 2004 that existing provincial forest designation and land-use planning processes will be
used to implement the Working Forest commitment. Resource targets are being established under each land-use plan specifying
land areas in the Working Forest supporting forestry and other uses and values such as habitat for wildlife. While different
from the original concept, this approach being implemented responds to extensive feedback from stakeholders.
Performance Measures and Results
Progress on specified priority strategic-level plans:
The following performance measure and targets specify the ministry's commitment to completing priority strategic-level plans
and accompanying implementation strategies and policies. Completion of strategic-level plans helps ensure resource management
decisions take into account the needs of communities, the economy, the environment, and First Nations values and concerns,
now and into the future. The plans also facilitate access to, and use of, Crown lands and resources, particularly where competition
between commercial and public interests for these resources is strong.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
Specified priority strategic-level plans and accompanying implementation strategies (and policies) which satisfy the governance
principles for sustainability, completed and forwarded for government decision by target dates
|
Priority Strategic-Level Plans:
Planning table progress.
Central Coast, Morice:
completed
North Coast:
agreement in principle
Sea-to-Sky:
deliberations substantially completed
|
Priority Strategic-Level Plans:
Original Target
-
Haida Gwaii/Queen Charlotte Islands strategic-level plan completed
Revised Target
- Planning table process completed by March 31
- Government-to-government consultations with First Nations completed by Sept. 30, 2005
|
Priority Strategic-Level Plans:
- Planning table process completed in February
- The Cabinet Committee on Environment and Resource Development (CCERD) extended timelines for government - to - government consultations
with First Nations
|
Achieved
Discussions underway prior to formal government-to-government consultations with First Nations
|
Working Forest Policy:
-
Enabling legislation passed
|
Working Forest Policy:
Original Target
-
Working Forest land base designated
Revised Target
|
Working Forest Policy
- Revised policy completed July 29, 2004
- Announced in July 2004 that the existing provincial forest designation and land-use planning processes will be used to implement
this commitment
- First-year targets have been achieved of a three-year implementation program
- MSRM is continuing to support the ministries of Forests and Water, Land and Air Protection in the development of resource
targets
|
Achieved
|
Accomplishments
-
Planning has been completed for the Central Coast, North Coast, Lillooet, Morice, Sea-to-Sky LRMPs and Haida Gwaii/Queen Charlotte
Islands land-use plan. Government-to-government consultations with First Nations are now proceeding. These plans cover an
additional 12 per cent of British Columbia bringing to 85 per cent the area of the province covered by such plans. Completing
these plans will ensure all stakeholders pursue sustainable courses of action and provide economic benefits through improved
investor confidence.
- The Working Forest policy was completed in July 2004. Government announced implementation of the policy through three existing
tools: 1) strategic land-use plans such as LRMPs, 2) retention of existing Provincial Forest designation, and 3) commitment
to implement net timber area objectives (targets) to define areas available for timber harvesting and other uses. The Provincial
Forest designation applies to 75 million hectares of Crown forested and non-forested land - retaining this designation confirms
more than 75 per cent of the provincial land base (outside of protected areas) is available not only for forestry uses, but
also tourism, mining, energy, ranching, recreation, conservation and wildlife habitat.
Objective 2: Complete priority resource planning and associated projects that support development of mandatory, legislated
resource objectives
Progress with respect to the completion of resource targets under this objective was less than expected due to a redirection
of funding to other priorities. However, work on the high priority sustainable resource plans surpassed its target with 71
per cent of priority plans completed in 2004/05.
Strategies
- Complete sustainable resource management plans to provide basic biodiversity objectives and resource targets required under the Forest Practices Code, Land Act
and
Muskwa-Kechika Management Area Act.
- Ensure all high-priority SRMPs include consultation with and participation of interested First Nations.
- Develop and implement operational policy, including the Working Forest initiative and associated resource targets.
Performance Measures and Results
SRMPs completed and resource targets achieved:
The measure indicates the progress being made by the ministry in its part of the implementation plan for results-based forestry,
which is reducing regulation and increasing economic and social benefits while maintaining environmental integrity. The ministry
achieved its target for the completion of high priority plans. Due to a redirection of resources to other priorities, the
performance target for completing resource targets for a certain percentage of the province was not achieved.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Percentage of high priority SRMPs and resource targets completed that are required to support the
Forest and Range Practices Act
and
Forest Practices Code
by specifying key biodiversity objectives
|
- 46% of high-priority plans completed by end of 2003/04
- Resource targets completed for 0% of the province
|
- 70% of priority plans completed
- Resource targets completed for 66% of the province
|
- 71% completed
- Resource targets completed for 33% of the province
|
Achieved
Not Achieved
-
Resources reduced due to other priorities1
|
Accomplishments
- The Dease-Liard SRMP was completed, which will allow the Minister of Forests to proceed with a long-promised tenure to the
Kaska-Dena First Nation and to the implementation of a scientifically-based approach that provides for social and economic
well being, balanced resource decisions and sustainable development.
- A pilot project was completed in the Kootenays on the development of land-base targets for tourism. These targets will confirm
land-use plan direction for the tourism resource and provide a basis for plan implementation and monitoring.
Objective 3: Undertake land and resource planning and associated projects that address the use and management of Crown land
and resources for sustainable economic development and diversification opportunities
Considerable progress has been made under this objective with respect to completion of priority coastal plans, economic opportunity
plans and resource access strategies. In addition, the ministry was successful in identifying numerous business opportunities
which were acted on by First Nations, thereby promoting resource stewardship and economic activity. The ministry has also
played a significant role in providing land-use advice in the Sea-to-Sky area for the 2010 Olympic and Paralympic Winter Games.
Strategies
- Develop and update sector (mining, oil and gas, tourism, and agriculture) Crown land and resource access strategies involving
land-use planning to support government's overall economic strategy.
-
Work with other government agencies to increase mineral exploration opportunities on Crown lands outside established Protected
Areas.
-
Complete priority coastal plans and economic opportunity plans that provide sustainable economic development opportunities.
-
Develop initiatives and agreements with First Nations that promote resource stewardship and economic activity.
-
Establish agreements and other tools to support the sustainable use and management of Crown land and resources and resolution
of associated issues and conflicts.
-
Provide advice on land-use issues associated with the 2010 Olympic and Paralympic Winter Games.
Performance Measures and Results
Progress of sector strategies:
This measure gauges progress in completing Crown access strategies designed to contribute major socio-economic and environmental
benefits for the province.
Priority coastal plans and economic opportunity plans completed:
Completion of these plans is an important performance measure for this objective because both plan types remove access constraints
and provide significant information to investors and others wishing to access the province's resources.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
- Specified sector strategies updated by target date
|
-
Crown land and resource access strategies completed for minerals, oil and gas and agriculture
|
-
Complete an aquaculture Crown resource access strategy
|
- Aquaculture strategy replaced by Marine Mosaic project
- Marine Mosaic report completed. The report contains specific recommendations that will assist LWBC to develop an action plan,
should they so choose
|
Achieved
-
Marine Mosaic is a broader coastal strategy, which includes more than just the aquaculture sector; First Nations aquaculture
strategy already completed
|
-
Number of priority coastal plans and economic opportunity plans completed by target date
|
-
Two coastal plans and four economic opportunity plans completed (including two pre-tenure plans in the Muskwa-Kechika Management
Area)
|
-
Three new priority economic opportunity plans completed, including all (remaining) Muskwa-Kechika pre-tenure plans
|
- Malaspina Okeover and Johnstone-Bute coastal plans completed
- SRM plan for recreation access and development completed for 847,000 hectares
- Pre-tenure plans completed for three additional areas; a previously completed Muskwa-Kechika pre-tenure plan is now being
updated
|
Achieved
|
Crown land identified for sale or tenure7: Through certain types of land and resource planning studies, the ministry improves Crown land access by identifying additional
land available for sale or tenure. The provincial agency Land and Water BC Inc. then conducts the allocation processes. Target
achievement will enable greater economic opportunities in rural British Columbia.
New First Nations business opportunities identified:
This measure provides an indication of the progress the ministry is making in identifying new First Nations business opportunities
through MSRM projects and acted on by First Nations.
Performance Measures
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Hectares of additional Crown land identified for sale or tenure as a consequence of land and resource planning1
|
-
1,200 hectares of new land available for sale or tenure by Land and Water BC Inc. in the South Okanagan as a result of the
Okanagan/ Similkameen
Land Act
review project
|
-
1,000 additional hectares of Crown land identified
|
- Report completed which reviewed 800 hectares of Crown land on Vancouver Island for potential sale or lease by LWBC
- The initial phases of two other studies were completed, but not to the stage that would allow LWBC to sell or tenure the land
- Phase I of Vancouver Island report completed and assessed by principal agencies
- Phase 1, East Portion of Kootenay arability study covering 58,905 hectares of Agricultural Land Reserve land
|
Mostly Achieved
-
Nadina Crown land study postponed indefinitely as partner agency unable to support due to change in regional priorities
|
-
Number of new First Nations business opportunities identified through MSRM projects and acted on by First Nations
|
-
23 action plans were completed to improve First Nations economic participation in resource, tourism and independent power
projects
|
-
10 new business opportunities identified and acted on for First Nations
|
- 78 new business opportunities identified
- 49 new business opportunity feasibility analyses completed
- 29 new business plans completed utilizing $3 million in funding leveraged from other sources
|
Achieved
|
Accomplishments
- Three pre-tenure plans were completed in the Muskwa-Kechika Management Area (M—KMA). All high priority areas for gas development
in the M-KMA are now available for tenure sales and exploration activities. The pre-tenure planning project is providing revenue
to government through increased sale of oil and gas rights in the M-KMA and paves the way for increased exploration and production
to contribute to government's objective of doubling oil and gas activities in BC.
- Coastal plans for Quatsino Sound, the Malaspina and Okeover Inlets system and Johnstone-Bute were completed. These plans provide
a framework for the sustainable marine development and diversification of these areas through tourism, shellfish and finfish
aquaculture and associated infrastructure development (docks, wharves, etc.).
- Phase 1 of the Kootenay arability analysis was completed. The analysis defines potentially arable and non-arable areas within
the existing Canada Land Inventory, the Soil Capability for Agriculture Classes 3—5, and within the Crown land portion of
the Agricultural Land Reserve. The product of this phase of the analysis will form the basis of further refinement of arability
information based on field work to be done in the region in Phase 2. Industry has indicated financial support for Phase 2.
- The Cranbrook West Recreation Management Strategy (RMS) was completed involving extensive consultation and consensus agreement
by 34 stakeholder groups. The plan provides strategic direction for public and commercial recreation access, including aerial
access, and development. It helps to address impacts and conflicts and protect resource values, as well as providing increased
certainty for commercial tenuring.
- Implementation was completed of economic recommendations contained in the following plans:
- Kyuquot Sound Coastal Plan working with the Ka:'yu:'k't'h and Che:k'tles7et'h' First Nations to undertake business plans,
feasibility studies and a strategic plan for community development.
- Cortes Island Shellfish Aquaculture Plan working with the Klahoose First Nation to undertake a Pumpout Station Business and
Operations Plan.
- Baynes Sound Shellfish Aquaculture Plan working with the Comox First Nation to secure funding for a microbial source tracking
and remediation project and Pentlach Seafoods Business Plan to facilitate commercial operations of the LWBC tenures negotiated
as a result of the Plan.
- The implementation of a multi-year Economic Measures Agreement was completed with the Kwakiutl District Council/Musgamagw-Tsawataineuk
Tribal Council/Tlowitsis First Nation. The agreement was developed as a result of the involvement of 13 First Nations in the
Central Coast Land and Resource Management Plan (CCLRMP).
- Implementation was completed of primary projects contained within the Central Coast and North Coast Shellfish Strategy and
Coastal Tourism Plan, working with the Turning Point Initiative on behalf of its member nations. The Central and North Coast
Shellfish Aquaculture Business Plan and Tourism Development Plan were also completed.
- Implementation of the Hanson Island Economic Measures Agreement and Hanson Island Management Agreement were completed in support
of a head lease agreement with LWBC.
- Certainty for mineral exploration in BC was enhanced by conducting five "Joint Solutions" workshops across the province with
other government ministries and the mining industry; a draft report is being compiled for release.
Goal 2: Effective delivery of integrated, science-based land, resource and geographic information
Core Business Area: Integrated Land and Resource Information
Objective 1: Integrated land and resource information
The ministry has made good progress this year on information integration, to improve the quality, relevance and management
of and access to information. The Land Resource Data Warehouse continues to grow with the addition of more information critical
to the facilitation of decision-making on land and resource issues. A pilot of the Integrated Land and Resource Registry is
ready to be launched publicly in the northeast of the province. Overall, client satisfaction with information services has
improved.
Strategies
-
Provide integrated registry information.
-
Provide integrated resource information.
-
Provide a geographic spatial reference for the province.
-
Deliver an integrated data warehouse for access to resource and registry information.
-
Maintain an operational information management infrastructure.
Performance Measures and Results
Loading the Land and Resource Data Warehouse:
The data warehouse contains data sets8
identified by clients as a priority. Integration of these priority data sets around common attributes is a key project for
the ministry and our clients. Progress is measured against a baseline data-set number of 132 from 2001/02.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Percentage of land and resource data sets loaded into the Land and Resource Data Warehouse
|
-
59% (56 of 95 priority data sets at April 1, 2002)1
|
|
-
78% (73 of 95 priority data sets)
|
Target Exceeded
|
Accomplishments
- The Land and Resource Data Warehouse, developed and managed by Land Information BC, is reaching an advanced stage of development
both in terms of the number of integrated data sets it contains and the tools available to resource users for the analysis
of the information. Economic, social and environmental benefits are resulting for all stakeholders through their ability to
more rapidly and thoroughly access the possible impacts of potential developments such as new mines and tourism outlets.
- The warehouse now contains more than 73 data sets or over 78 per cent of data sets originally considered a priority by clients
established during phase I of the LRDW project. This includes information, for example, on mineral and petroleum tenures.
A new Web portal provides a single window to online resource information and the use of corporate geographical information
system tools.
- The Integrated Land and Resource Registry (ILRR) pilot project is operating within government and is due to be launched publicly
in the northeast portion of BC on schedule in the spring of 2005. In 2004/05, Land Information BC completed the formal ILRR
system design and construction. This Web-based, integrated registry of legal rights and interests to land and resources will
replace the need to search multiple registries across government to access this information. As a result, it will be possible
to find out in minutes who has the rights or interests and for what purpose over any parcel of land - something that currently
takes days or weeks. The ILRR pilot in the northeast will be of particular value to the oil and gas industry but will benefit
all resource sectors in this area.
Objective 2: Effective delivery of client services
The ministry has achieved good results in providing its clients with efficient access to quality land and resource information
that supports decision-making. Client satisfaction with land information services covered by service agreements exceeded its
target, due in part to improvements in electronic application submissions for government services.
Strategies
-
Provide access to information for government, industry and public clients.
-
Provide decision support, information management services and products in support of economic development and land-use planning
(supports Goal 1).
-
Provide decision support, information management services and products to other government agencies and partners.
-
Provide land title and registry services.
Performance Measures and Results
Client satisfaction with land information services and land title efficiency:
The performance measures below were chosen to gauge the level of support for clients who use the ministry's land and resource
information through service agreements and to indicate the efficiency of the land title system. The second measure was calculated
until December 2004 and then discontinued, due to the establishment of the Land Title and Survey Authority, which is now responsible
for maintaining the land title system in BC.
Performance Measures
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Percentage of clients satisfied with land information services covered by service agreements
|
- Baseline survey developed, tested and administered by BC Stats
- 2003/04 baseline of 46%
|
Amended Target1:
- 51% (actual 2003/04 baseline of 46% plus 5 percentage points - the target improvement implied by the original target and
baseline)
|
|
Achieved
|
-
Average number of working days to examine land title transfers and charges
|
|
|
-
5.5 days at Dec. 31, 2004 (after which the function and measure was transferred to the new Land Title and Survey Authority)
|
Achieved
|
Accomplishments
-
Considerable advances have been made in systems to permit electronic submission of applications for government services, thus
reducing costs and speeding up access. For example, land titles filing submissions can now be made electronically. In addition,
the Archaeological Data Import Facility was completed in December 2004 with pilot training of the core user group proceeding
in March 2005.
Objective 3: Transformed business, including e-government, deregulation and alternative service delivery
Land Information BC continues to be the driving force behind changing the way information services are delivered within the
natural resource sector. This transformation includes business practices, electronic service delivery and partnerships. The
Land Information BC portal is the delivery agent of land and resource information e-services. More than 40 online services
are now available. An integral part of Land Information BC's responsibilities is to seek opportunities for alternative service
delivery arrangements. Over the past year more partnerships were established that will leverage funding and technological
advancements for the benefit of clients. The Integrated Cadastral Information Society, a partnership of local government,
utility companies and the provincial government to deliver an integrated cadastral fabric for BC, is an example of new ways
of doing business. For more details, see http://www.icisociety.ca/.
Strategies
- Migrate to electronic service.
-
Develop and maintain partnerships with other governments, industry, academia and other organizations.
Performance Measures and Results
Partnership benefits:
The ministry's overall cost recovery, cost reduction and cost avoidance from partnerships with other governments, industry
and academia provides an indicator of partnership benefits.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Amount of cost recovery, cost reduction, cost avoidance and grants/contributions through partnerships
|
|
-
$3.1 million from partnerships (cumulative value)
|
|
Target Exceeded
|
Accomplishments
- In many cases developments in systems and information infrastructure are being pursued through partnerships. For example,
the ministry and the University of Victoria have jointly established a BC Centre for Applied Remote Sensing, Modelling and
Simulation. An information sharing agreement has also been signed with the Ontario government for technology and land and
resource information management. This saves time and money in collecting, storing and distributing digital data.
- The newly created Land Title and Survey Authority will improve the speed of these services to property owners and reduce the
overall costs to BC residents. The Authority brings new technology, expertise and management flexibility to the provision
of vital services and also provides stakeholders with meaningful involvement through a partnership with the Corporation of
BC Land Surveyors.
- A public-private partnership was created with EPCOR Britannia Water Inc. for the design, construction, financing and operation
of a water treatment plant at the Britannia mine.
Goal 3: Sound governance of land and resource management
Core Business Areas: Sound Governance and Property Assessment Services
Objective 1: An effective policy and legislative regime governing land and resource management
The ministry surpassed its target for reducing the number of regulatory requirements in legislation, regulation and policy.
Significant advancements were also made with respect to reviewing and developing strategic policies such as the BC Trust for
Public Lands, and legislation such as the
Land Title and Survey Authority Act.
Strategies
-
Reduce the number of regulatory requirements.
-
Review and develop effective strategic policies and legislation particularly for property assessment, revenue, land and water
governance.
-
Complete Property Assessment Review Panel process by March 31 of each year.
Performance Measures and Results
Reducing the regulatory burden:
This performance measure gauges the ministry's progress in supporting the government's goal of reducing the regulatory burden
and outdated policies. The ministry far exceeded its 30 per cent target by achieving a 37 per cent reduction in the number
of regulatory requirements.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Percentage reduction in the number of regulatory requirements relative to the June 2001 base number of 9,373
|
|
|
- 37% (by end of June 2004)
- 37% at March 31, 2005
|
Target Exceeded
|
Accomplishments
- The ministry led the development of policy, consultations and the selection of trustees for the creation of a BC Trust for
Public Lands to which the government contributed $8 million. This will provide a coordinating mechanism to better protect
ecologically important land and will result in increased habitat conservation and green space.
- Free Crown Grant and Nominal Rent Tenure policies were revised and implemented to improve government accountability for dispositions
of Crown land and to stimulate economic development.
- Changes to the assessment policy for Bed & Breakfasts have been implemented providing up to $3,000 annual tax savings for
operators with four or more rental units, according to industry estimates.
- The ministry is leading the development of a Fossil Management Framework for BC. The first step was taken under a new regulation
introduced in January under BC's Mineral Tenure Act, to set out clear guidelines for the management and protection of fossils as a heritage resource.
Objective 2: A framework for sustainable resource management that informs policy and performance management
The ministry has succeeded in advancing sustainability and performance management on a number of fronts. This includes incorporation
of the Governance Principles for Sustainability in the development of ministry strategic planning initiatives, involvement
in key intergovernmental activities, and promotion of an integrated model of performance and risk management.
Strategies
-
Improve application of governance principles for sustainability within the ministry to key land and resource management decisions.
-
Undertake outreach activities with the resource sector, academia and non-governmental agencies to advance sustainability thought
and practice.
-
Develop and implement a comprehensive performance management system.
-
Develop and implement a ministry enterprise-wide risk management (ERM) process.
-
In partnership with the Ministry of Water, Land and Air Protection, provide advice on sustainability and environmental strategies
associated with the 2010 Olympic and Paralympic Winter Games.
Performance Measures and Results
Furthering sustainability:
The first measure below is important as the sustainable use of resources is key to economic development in British Columbia.
Resource investment in the province will be encouraged by a regulatory environment that streamlines decision-making, ensures
present and future generations will benefit from activities, and maintains ecological integrity. The Governance Principles
for Sustainability have now been fully incorporated into the ministry's strategic planning process and hence actual results
exceeded the target. Consequently a new sustainability measure has been adopted in the 2005/06 – 2007/08 service plan.9
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Percentage of MSRM's key strategic policies that incorporate the Governance Principles for Sustainability (e.g., Working Forest,
SRMPs, etc.)
|
- Baseline determined as 52% (16 of 31 SRMPs)
- Targets set at 50% for 2004/05, 75% for 2005/06 and 100% for 2006/07 and beyond
|
|
|
Target Exceeded
|
Implementing enterprise-wide risk management:
The second measure provides an indication of the ministry's progress in incorporating the government-wide enterprise-wide
risk management policy. As part of the ministry's performance management and decision-making processes, this will improve
the efficiency of resource allocation by prioritizing risks and opportunities, delegating risk management and communicating
risks and management strategies.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
MSRM's degree of maturity in implementing enterprise-wide risk management (ERM) based on a five-year, three-phase plan
|
- Enterprise-wide risk management initiated
- Initial division and branch scans of priority risks
|
-
Continuation of initial phase
|
- All divisions undertook risk scans and developed treatment plans for major risks
- Divisional risk scans and treatments plans were communicated
- Executive undertook their own risk scan
- Work is underway to better integrate ERM into performance management and decision-making processes before launching additional
training
|
Achieved
|
Accomplishments
- As part of on-going sustainability workshop series, the ministry partnered with the Canadian Business for Social Responsibility
(CBSR) and a number of other governmental, industry and First Nations agencies, to host a workshop called Building Sustainable
Relationships: Aboriginal Engagement and Sustainability.
- Roll-out was completed across the ministry of the previously developed Application Guidelines to provide clarity to the Governance
Principles for Sustainability in support of the development of ministry strategic planning and policy initiatives.
- The ministry continued to participate in sustainability outreach activities such as the Fraser Basin Council, including the
sustainability indicator program as highlighted in the "State of the Basin" conference.
- The ministry was a key partner in the Georgia Basin Action Plan (with Environment Canada, Fisheries and Oceans Canada, Parks
Canada and the Ministry of Water, Land and Air Protection).
- The Sustainable Development Working Group of the Pacific Northwest Economic Region was co-chaired by the ministry.
- The ministry continued to work with the Ministry of Energy and Mines, and the Mining Association of British Columbia, on development
of a Sustainable Mining Strategy for BC.
- The ministry's service plan performance measures have been reduced in number from 17 in the 2004/05 – 2006/07 service plan
to 12 in the current 2005/06 – 2007/08 plan. This is in accordance with a BC Reporting Principle of focusing on only the few,
critical aspects of performance.
- Implementing enterprise-wide risk management across the ministry continued. High-priority risks have been identified and risk
mitigation plans are being developed for these as the first stages in this implementation.
Objective 3: Effective and efficient management of contaminated sites on provincial lands
The ministry has made considerable progress under this objective by providing leadership across government for the management
of provincially-owned contaminated sites and ensuring they are managed by a consistent, informed, priority-based process.
Progress made on remediation of the Britannia Mine site was also a notable achievement.
Strategies
-
Direct and coordinate the management of provincial contaminated sites.
-
Ensure information critical for management of provincial contaminated sites is available.
-
Implement accountability and reporting requirements related to provincial contaminated sites.
-
Effectively manage individual contaminated sites for the ministry, including overseeing remediation of the Pacific Place site
and the Britannia Mine site.
-
Minimize provincial liability for remediation of Crown-owned contaminated sites.
Performance Measures and Results
Implementing government-wide contaminated sites management program:
The first measure below is used to indicate the success the ministry is having in implementing a key recommendation of the
2002 Auditor General Report on Managing Contaminated Sites on Provincial Lands.
Remediating Britannia Mine Site:
The second measure provides details of progress in the ministry's remediation of a specific Crown contaminated site.
Performance Measures
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
2004/05 Variance
|
-
Implement government-wide contaminated sites management program
|
- Business plan and data base developed
- Policy and reporting requirements defined
|
- Government-wide program implemented
- Reporting requirements implemented
- Plan established to identify contaminated sites
- Inventory of existing contaminated sites on Crown lands
|
- Plan established in conjunction with the provincial Contaminated Sites Committee
- Database to have 300 sites entered; actual result was 540
|
Achieved
-
Website to be launched in summer of 2005
|
-
Oversee remediation of the Britannia Mine site
|
- Submitted remediation plan
- Issued requests for expressions of interest for the water treatment plant
|
- Water treatment plant commissioned
- Complete majority of remediation activities
|
- Successfully entered into a P3 contract with EPCOR Water for the design, building, financing and operation of a Water Treatment
Plant for a 21year term
- Remediation activities on target. Continued the implementation of the Stage 1 Remedial Action Plan
|
Achieved
Achieved
|
Accomplishments
- Ministry action to coordinate management of contaminated sites on Crown land across all provincial ministries and agencies - and undertake remediation work on priority sites such as the Britannia Mine - is already resulting in reduced concerns and
additional investment. Sites are being inventoried, assessed and prioritized for remediation work where necessary on the basis
of public health and environmental risks. For example, at the Britannia Mine site, a contract was signed with EPCOR Britannia
Water Inc. for the design, construction, financing and operation of a water treatment plant as a public-private partnership.
Construction of the plant is expected to be completed in November 2005 with operation by year end.
- Environmental assessment reports were received for the Yankee Girl Mine Site that are being assessed to determine the best
approach to address potential health and environmental risks associated with public use of the site and the fishery resource
in the Salmo River.
- To improve reporting on government's contaminated sites, the Crown Contaminated Sites Program Website has been developed.10 It provides current information on the program framework, priority sites and ongoing remedial activities on specific sites.
Implementation of proper accounting practice will also result in more consistent reporting of provincial financial liabilities
associated with contaminated sites for 2004/05.
Goal 4: Organizational excellence
Core Business Area: Goal 4 is supported by all core businesses of the ministry
Objective 1: Demonstrated visionary leadership and continuous improvement
Fundamental to the ministry's success is a skilled, flexible and dedicated team of employees. The ministry is committed to
ensuring that employees are satisfied with their jobs and is continuously communicating its vision and business model to its
staff and clients. Staff satisfaction and understanding of the ministry's direction exceed the government average.
Strategies
- Staff clarity of the ministry vision, objectives and priorities.
- Leadership across government through increasing core competencies of staff.
- Executive and Senior Management team provides consistent direction and timely communication to staff.
- Evaluation of service-level agreements.
Performance Measures and Results
Staff satisfaction and understanding:
This performance measure was used to gauge the staff satisfaction level and staff understanding of ministry direction.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
Explanation of Variance
|
-
Office of the Auditor General survey results1: staff satisfaction and staff understanding of ministry direction
|
|
-
Meet or exceed government average
|
- 51.7% of staff agree they are satisfied
- Government average: 50.2%
- 51.2% of ministry staff agree they have a clear understanding of the ministry's vision
- Government average: 50.6%
|
Achieved
-
Ministry staff satisfaction exceeded the government average on: career advancement opportunities, day-to-day work activities,
ministry leadership/executives, departmental managers, the person one reports to, and individual recognition
|
Accomplishments
- Participated in Corporate Succession Planning through the Leadership and Learning Centre.
- Monthly electronic roundtable updates given by executive to report on business initiatives throughout the ministry.
- Ongoing evaluation of service-level agreements with shared services partners.
- Approximately 25 per cent of ministry staff participating in a ministry mentoring program that focuses on competency development.
Objective 2: Performance-focused staff
The ministry is continuing to focus on the use of employee performance and development plans (EPDPs) by all employees and
ensuring that staff is engaged through the full cycle of this ongoing, annual process. By developing EPDPs at all levels throughout
the ministry, staff is aware of how their work ties in with service plan objectives and their future career objectives can
be established.
Strategies
-
Ministry-wide learning strategy developed and put into action (in divisional plans).
-
All staff assist ministry to achieve ministry priorities.
-
Introduce "360 leadership" feedback to staff to improve leadership competencies.
-
Training and succession planning to build staff competencies.
Performance Measures and Results
Use of EPDPs:
The following performance measure is used to confirm commitment to a performance management culture across the ministry through
employee performance and development plans. EPDPs are the key tool linking organizational needs with individual activities
in a learning and developmentally supportive manner.
Performance Measure
|
2003/04 Actual
|
2004/05 Target
|
2004/05 Actual
|
Explanation of Variance
|
-
Percentage of staff that have an employee performance development plan (EPDP)
|
|
|
|
Mostly Achieved
-
Staffing changes and the temporary nature of certain work assignments explain this variance
|
Accomplishments
-
Staff was instrumental in developing ministry and division People Plans that include objectives and strategies on employee
learning, work/life balance, and increasing communication at all levels.
- Implemented "360 leadership" feedback and coaching for a majority of senior manager and executive staff.
- Developed and delivered a Management and Leadership Program to develop future leaders within the ministry.
- Accessed over $313,000 of corporate-funded leadership, training and development courses through Learning Services at the BC
Public Service Agency.
- A staff coalition has been formed to develop a succession management strategy.
Deregulation
The ministry exceeded its
New Era
commitment to cut red tape and reduce the regulatory burden as part of its three-year deregulation plan (Phase 1). As reported
on page 38, the ministry surpassed its 30 per cent target by achieving a 37 per cent reduction in the number of regulatory
requirements by the end of June 2004. This reduction level remained the same at year end. In keeping with Phase 2 of provincial
regulatory reform, the ministry is ensuring a zero per cent net increase in its regulations over the next three years and
working towards further improvements to its regulatory regime.
|